Friday, 17 April 2015

AVC Filming

AVC Filming Day - 13/04/15
Present – Abby, John, Dan, Nathan, Jacob, Andy & Rosie

We started the day on my project as I needed day light and specific slightly dull weather to keep the outside shots consistent. We filmed the outside shots first to prevent any weather changes from becoming a hindrance and mainly kept the rest of filming in the order it would be edited into. I did struggle to keep such a large group of people focused for the entirety of the shoot, causing some shots that I had originally planned to be either changed or missed out completely. I also had a problem in one shot with the transition between outdoor and indoor light smoothly and may have to add something in editing to make this more acceptable. I also have some sound problems with both wind outside and the echoing of the corridors inside my building, hopefully I will be able to normalize this sound in post. 

No comments:

Post a Comment